Construction engineering
Owner’s engineer support, constructability review, RFIs, inspection coordination, quantity checks, and pay-estimate review. The same work done on SH 99 / SH 249, Tomball Tollway, IH 45, Lorraine Underpass, and SH 36.
Houston · Texas PE · Firm F-22894
Construction engineering, utility coordination, traffic control plans, TDI windstorm inspections, foundation letters, solar PE stamps, and sign and seal review — from a Texas PE with 10+ years on Houston highways, toll roads, and city projects.
Built around Texas PE practice: sealed documents, constructable details, and field-aware review.
Owner’s engineer support, constructability review, RFIs, inspection coordination, quantity checks, and pay-estimate review. The same work done on SH 99 / SH 249, Tomball Tollway, IH 45, Lorraine Underpass, and SH 36.
Work-zone layouts for sites, utilities, and road work. City, county, and TxDOT-format sets. Informed by years of monitoring traffic control on HCTRA and TxDOT projects.
TDI-appointed inspector since 2021 with hundreds of residential structural assessments across Texas. Coastal WPI-8 / WPI-8E support: site inspection, sealed evaluation, and TDI filing coordination so the improvement can qualify for TWIA.
Independent review of drawings and calculations, then a Texas PE seal when the work meets the standard. Digital seal standard. Wet ink when the city still wants paper.
Rooftop and ground-mount structural letters, attachment review, and sealed permit sets for installers and owners. High-wind and coastal conditions priced separately.
Foundations, framing, metal buildings, additions, and load-path design. Calculations, details, and permit drawings. Background in load takeoff, reinforcement, and field verification — not desk-only design.
Added from actual project work — utilities, quantities, and field quality — not a generic PE menu.
Conflict review, relocation coordination, records research, and SUE support for roadway and site projects.
Contractor submittals checked against the sealed design before they get built wrong.
Pavement, concrete, and earthwork quantities for bids, change orders, and monthly estimates.
Sealed letters for slabs, piers, and small structures when the city or lender wants an engineer on file.
Field markups turned into a clean record set, or a review that the built work matches the permit drawings.
Scope, quantity, and entitlement review before you sign extra money on a highway or site job.
Texas PE 140695 · Texas Registered Engineering Firm F-22894
Mohammad Alani is a Texas Professional Engineer with more than ten years of experience as a construction engineer, design engineer, and field engineer on Houston-area highway, toll road, utility, and city projects.
Since 2021 he has served as an appointed inspector with the Texas Department of Insurance, carrying out hundreds of structural assessments of residences across Texas. Since 2023 he has served FEMA as an on-call site engineer, overseeing structural inspections of highways and bridges after hurricanes and other disasters across the southern states.
His work covers utility engineering and coordination, subsurface utility engineering (SUE) reports, construction management and inspection, construction materials testing, geotechnical field investigations, land development design in Civil 3D, change orders, RFIs, submittals, and monthly pay estimates.
Personal experience of Mohammad Alani with prior employers.
Standard scopes. Incomplete drawings, extra visits, and rush work are quoted after we see the files.
$650 starting
$395 starting
$900 starting
$1,250 starting
| Service | Standard scope | Starting fee | Time |
|---|---|---|---|
| Structural letter | Defined condition, sealed letter | $450 | 2–4 days |
| Structural design | Residential addition / small commercial | $2,800+ | 2–4 weeks |
| Independent review | Drawings + calcs | $1,200 | 1–2 weeks |
| Solar PE stamp | Standard residential rooftop | $395 | 2–5 days |
| TCP design | Single-phase local / site | $900 | 5–10 days |
| Windstorm | Completed residential evaluation | $1,250 | Visit + filing |
| Utility coordination | Conflict package / relocation support | Quoted | By phase |
| Construction engineering | Observation, RFIs, quantities | $175/hr starting | As needed |
Starting fees for complete Texas packages. Travel outside Houston metro, extra site visits, and resubmittals after the included revision may be extra. A written proposal is issued before work starts.
Files in. Scope in writing. Seal out.
Plans, photos, address, AHJ, deadline.
Fee and delivery date before we start.
Calcs, drawings, TCP, or inspection.
Texas PE 140695 on the deliverable.
Alani Engineering
Mohammad Alani, P.E. — Houston. Call, text, or send the form.
(832) 847-8877
ceng.m.alani@gmail.com
Houston, Texas
Texas PE 140695 · Texas Registered Engineering Firm F-22894